Bagnall 3050 10 year Overhaul

Rustenberg Platinum Mines No. 4
Welsh Highland Railway 'Gelert'

Part 1


19/11/00
Work on stripping Gelerts boiler has now started, these are some of the latest photos

9/12/00
The boiler has now been removed from the frames.

Christmas 2000, and the tubes have been removed, and work started in removing the faulty stays.
 
The old boiler tubes.
At the same time, Gelerts Sister loco, Bagnal 3023, has its boiler readied for the boiler inspector.
April, and now all the faulty stays, including all the ones installed by 'Winsons', have been removed.

Dave Ruston Works on the boiler, stored behind the frames.

Click here for Part 2