Rebuilding Bagnall 3050 Registered Charity Number 1171674
The orignal work to rebuild Gelert started when Gelert arrived Fresh from the Rustenberg Platinum Mines, No 4 and was unloaded at the Welsh Highland Railway in 1982.
Click below on the images to find out more detail.

Another 2 years and a lot has happened, stripped down the frames are seen inside the 'Big Shed' at Gelert's Farm.

Some time later, and the boiler is placed into a Hudson Bogie Wagon.
For its first Steam test. Happily this test was past, and restoration continued.

7 Years later and nothing much has happened, apart from being painted Black, and moved into No1 Road.
The Locomotive in front is its sister from Rustenberg No3, Bagnal 3023.